Marina Lodges, Huntingdon
A mix of single and two storey lodges were created as part of the leisure development at Buckden Marina.
The lodges were provided as prefabricated units by a specialist supplier. Gawn Associates worked in conjunction with the lodge manufacturer to design a timber chassis supported off steel driven piles installed off a ground mounted platform or floating barge depending on each individual pile location.